Enter equipment & transport
Add machines and transport movements per project phase, with pre-filled parameters per type — from crawler crane to plate compactor.
OUR WORK/STIKSTOFPLANNER
NITROGEN & PERMITSA screening tool, built for a road construction contractor, that gives immediate insight into the nitrogen emissions and deposition of construction projects: equipment and transport in, deposition per Natura 2000 site and a report out.
From equipment list to nitrogen insight in minutesFor a road construction contractor, nitrogen determines whether a project can go ahead, and under which conditions. But the answer always came from outside: every variant meant a new specialist AERIUS calculation by an external consultancy — with a lead time of days to weeks.
As a result, nitrogen insight arrived late in work preparation. The effect of cleaner equipment, fewer operating hours or a different phasing remained guesswork, and permit risks only became visible once the plan was already fixed.
We dug into the AERIUS system and the AUB method for construction equipment, and mapped out together with the contractor which decisions call for nitrogen insight.
Equipment is chosen from recognisable types — excavator, roller, paver — with pre-filled parameters for power, operating hours, load factor and Stage class. Adjustable per machine.
Every result is traceable to source, phase and site, and the report is structured so that the outcome can be verified with an official AERIUS calculation.
The StikstofPlanner calculates according to the AERIUS AUB method: NOx emissions based on engine power, operating hours, load factor and emission category. The result is immediately visible on the map — per Natura 2000 site within 25 kilometres.
Add machines and transport movements per project phase, with pre-filled parameters per type — from crawler crane to plate compactor.
All Natura 2000 sites within 25 km, sorted by deposition contribution, with distance, direction and sensitivity per site.
Zero-emission equipment, fewer operating hours or a different phasing: the effect on emissions and deposition is immediately visible.
One report with emissions, deposition and assumptions — as an indicative screening, verifiable with an official AERIUS calculation.
What used to sit with an external consultancy for days to weeks, the work planner now does themselves — already during estimating.
Diesel or electric, more or fewer operating hours: every variant is calculated within a minute and can be compared on a substantiated basis.
Critical sites and contributions are known in advance, so the permit process starts with a substantiated case file instead of a surprise.
“You now answer the nitrogen question before the plan, not after.”